Port infrastructure

GENERAL INFORMATION

EQUIPMENT

  Length of barge berth: 230m (phase 1)

  Length of main berth: 800m (phase 1)

  Depth alongside: 16.5m

  Area: 72 ha (total phase)

   FCC: 5 barge quay cranes

   Safety working load: 40 MT

   STS Gantry Crane: 8 Super Post Panamax

   Safety working load:

  • 65 T (under spreader)
  • 85 T (under cargo beam)

   Outreach: 70 m (25 rows)

   Lift: 50 m above quay rails (10 tiers above deck)

   E-RTG: 24  

   Safety working load: 41 MT (under spreader)

  Tractor: 66

  Empty Handler: 4

  Reach Stacker: 2

  Forklift: 8