GENERAL INFORMATION |
EQUIPMENT |
Length of barge berth: 230m (phase 1) Length of main berth: 800m (phase 1) Depth alongside: 16.5m Area: 72 ha (total phase) |
FCC: 5 barge quay cranes Safety working load: 40 MT STS Gantry Crane: 8 Super Post Panamax Safety working load:
Outreach: 70 m (25 rows) Lift: 50 m above quay rails (10 tiers above deck) E-RTG: 24 Safety working load: 41 MT (under spreader) Tractor: 66 Empty Handler: 4 Reach Stacker: 2 Forklift: 8 |